Tank Doors Project

During 2024, Allmet undertook a project to fabricate four personnel and 2 machinery doors for industrial waste overflow tanks in Melbourne, from drafting of the engineering drawings to fabricating custom transport jigs and coordinating transport. These doors involved more than 100 individual parts and required our skilled boilermakers to work with a tolerance of 2mm across a 3-metre span to ensure a secure fit to the tanks.